Build Diary entries for December 2025

Here are the diary entries for this month. You can use the forward and backward links to see the next or previous months. Most photos taken before 2018 are small size. From 2018 onwards, most photos you see below will have a link to a full size image by clicking on the photo.

la Previous Month uparrow Return to 2025    
Cab Roof
01/12/2025
  Highslide JS
  A key job is to make sure that the cab roof fits properly. At the front and back, the roof is bolted to the cab frames. On the sides, the roof is bolted to the top cab window runner. First we fitted the cab runners to the side sheets using templates to ensure that they were set at the right height. You can see the brass window runners on the left and right of the photo above the window openings. Today's job was to refit the roof which is in 2 halves. Here, Steve, Roger and Jim are using a podger to get the holes lined up so they can get a bolt in. Next week, we will start fitting temporary bolts, starting at the centre, to bolt the roof to the front and back frames. We will then be able to start drilling the bolt holes to fasten the sides of the roof to the window runners.