Build Diary entries for April 2026
Here are the diary entries for this month. You can use the forward and backward links to see the next or previous months. Most photos taken before 2018 are small size. From 2018 onwards, most photos you see below will have a link to a full size image by clicking on the photo.
| Cab - Next Stages |
| 20/04/2026 |
| |
 |
| |
Today's job was to remove the cab from the frames and place it back down on the floor so we can work on it. In order to support the cab at the front, Diamond Engineering tack welded 4 supports to the bottom of the cab floor. Here Steve is grinding off the tack welds so we can remove the cab. In the photo, the cab was being supported by the overhead crane and was still bolted to the diaphragm plate at the rear of the cab.
Our next task will be to fit the ventilator panels on the roof of the cab. |
| |
|