News Archive entries for October 2023

Here are the diary entries for this month. You can use the forward and backward links to see the next or previous months. Most photos taken before 2018 are small size. From 2018 onwards, most photos you see below will have a link to a full size image by clicking on the photo.

la Previous Month uparrow Return to 2023 Next Month la
2023 AGM Photos
15/10/2023
  The 2023 Annual General Meeting of the Standard Steam Locomotive Co Ltd was held on 14 October at CTL Seal. photos can be seen at https://photos.app.goo.gl/2QxWUZEd9Jbc98z29
   
3D Model Update
22/10/2023
  pic
  With thanks to Will, our 3D model continues to develop. Will is currently working on the cylinder covers and you can see the front cylinder cover has been added. The holes at the bottom are for the bolt on type of cylinder relief valve. This valve is to prevent damage should the pressure in the cylinder get too high. The valve will be set to 25psi above boiler pressure.
   
Dragbox - Fabrication Complete (2)
23/10/2023
  pic
  This is the front of the dragbox. The drawbar passes through the hole in the centre and the drawbar spring bears on the central plate. We were concerned about the loadings on the front plate which Finite Element Analysis showed were on the high side. Therefore we added 4 strengthening plates to the rear of the front plate, 2 at the top and 2 at the bottom.